Invoice #9357 for (Nate Eaton)
8-007-784-1313
1981 Chevrolet C20

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:
Change Back to an RO

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2011-09-06CUSTOMER STATES THE ENGINE IS STILL RUNNING ROUGH, ESPECIALLY UNDER 1/4 THROTTLE WITH A LOAD ON THE ENGINE. TECHNICIAN CHECKED INTO THE CONCERN AND FOUND THERE TO BE A LOT OF SEDIMENT IN THE FUEL FILTER. ALSO TECHNICIAN FOUND THE ENGINE TO BE RUNNING LEAN. THE SEDIMENT IN THE FILTER LEAD US TO BELIEVE SOME MAY HAVE MADE IT THROUGH INTO THE CARBURETOR. TECHNICIAN REMOVED THE CARBURETOR DIS-ASSEMBLED AND FOUND SEVERAL PORTS TO BE PLUGGED UP, AND/OR RESTRICTED. TECHNICIAN CONTINUED TO DIS-ASSEMBLE AND PERFORMED A FULL RE-BUILD OF THE CARBURETOR MINUS THE GASKETS WHICH CHECKED OUT GOOD. AFTER REPAIR WAS COMPLETE TECHNICIAN TUNED ENGINE TO PASS EMISSIONS, AND TO ATTAIN OPTIMAL FUEL MILEAGE, USING METERING RODS AND MANUAL ADJUSTMENTS. VEHICLE IS NOW DRIVING MUCH BETTER, WITH VERY LITTLE TO NO DEAD SPOTS AT QUARTER THROTTLE. REPAIRS ARE BEING PERFORMED AS A COURTESY TO CUSTOMER. (NO CHARGE) LUKE HARRISON $277.82 
Discount (100.00%)-277.820.00 
2011-09-06DURING THE CARBURETOR/STUMBLING ISSUES TECHNICIAN FOUND THE ADVANCE CURVE FOR THE IGNITION SYSTEM TO BE WAY OUT OF SPEC. TECHNICIAN WAS ABLE TO DETERMINE THE SPRINGS AND WEIGHTS INSIDE THE DISTRIBUTOR WERE HANGING UP NOT ALLOWING THE DISTRIBUTOR TO FULLY ADVANCE UNDER HIGH RPM. TECHNICIAN DIS-ASSEMBLED CLEANED, AND LUBRICATED SPRINGS, SLIDES, AND WEIGHTS. AFTER RE-CHECKING THE SYSTEM THE ADVANCE CURVE IS WORKING PROPERLY. LUKE HARRISON $84.17 
Discount (100.00%)-84.170.00 
2011-09-06TECHNICIAN FOUND THE SPEEDOMETER TO BE INOPERATIVE AND RECOMMENDS REPLACE THE SPEEDO CABLE. TECHNICIAN REPLACED THE CABLE AND FOUND IT WAS STILL INOPERATIVE. AFTER FURTHER DIAGNOSIS TECHNICIAN FOUND THE CRUISE CONTROL ASSEMBLY WAS SEIZED. TECHNICIAN DIS-ASSEMBLE THE MODULE CLEANED, REPAIRED AND LUBRICATED, INSTALLED A SECOND NEW CABLE AND NOW THE SPEEDOMETER IS WORKING AS DESIGNED. LUKE HARRISON $111.65 
Discount (100.00%)-111.650.00 
Sub-total $0.00 
Total $0.00 
Total Discount $473.64 
Fee

Payments
Total Payments To Date $0.00 
Balance Remaining $0.00 
View all Payments for this Invoice