Invoice #4191 for (Emely Norman)
2-016-242-0176
1998 Chevrolet 1500 EXT CAB P/U

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2008-09-08ALTERNATOR DIAGNOSTIC CHARGING CHECK. BATTERY CORROSION SERVICE PACKAGE, CLEAN OFF AFFECTED ACIDIC AREAS AND APPLY CLEAR ACID ADHESION PROTECTANT. MASTER TECH FOUND LOOSE AND HEAVILY CORRODED BATTERY SIDE TERMINAL ENDS. REMOVED COVERS AND DEEP ACID CLEANED. THEN STEAM CLEANED BATTERY COMPARTMENT AND REMOVED LINGERING ACID CORROSION. THEN COMPLETED FULL CHARGING SYSTEM ANALYSIS AND FOUND LOW AMP OUTPUT FROM ALTERNATOR AND FOUND AUTOLITE ALTERNATOR TO BE 12 VOLTS BUT 20-37 AMPS, NOT THE 105 IT CLAIMS TO BE. CUSTOMER WARRANTIED PART IN EXCHANGE FOR A LOWER LABOR CHARGE AND MASTER TECH INSTALLED NEW ALTERNATOR AND DOUBLE CHECKED GROUNDS, BELT TENSIONER, WIRE CONNECTORS AND ALL CHARGING SYSTEM COMPONENTS. NOW FUNCTIONING AS DESIGNED. TECH THEN INSTALLED TWO NEW BATTERY SIDE POST TERMINAL BOLTS AND CLEANED TERMINALS AND ALL LEEDS TO BATTERY. INSTALLED CUSTOMER SUPPLIED ALTERNATOR WITH A TWO YEAR LABOR GUARANTEE AS PER CHECKER AUTOLITE ALTERNATOR GUARANTEE. RAY FODOR $47.50 
2008-09-08COURTESY INSPECTION (FREE) RAY FODOR $0.00 
Sub-total $47.50 
Hazardous Materials Disposal$2.02 
Shop Supplies$1.90 
Sub-total $51.42 
Tax ($6.55%)$3.11 
Total $54.53 
Fee

Payments
Total Payments To Date $54.53 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap