Invoice #17244 for (Candace Newman)
4-021-565-5417
2007 Ford Taurus

Warning: The registration on this vehicle has expired. It may need a new inspection.
Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2016-05-16A/C EVACUATE AND RECHARGE ADD DIE AND DIAGNOSE LEAK LUKE HARRISON $127.55 
2016-05-17AIR FILTER REPLACEMENT (APPLIES TO MOST VEHICLES) LUKE HARRISON $22.75 
2016-05-17BG - FLUSH - BRAKE LUKE HARRISON $79.99 
2016-05-17BG - FLUSH - TRANSMISSION LUKE HARRISON $173.67 
2016-05-17BG - OIL CHANGE - BEST - MOA ADDITIVE AND CF5 FUEL INJECTION CLEANER. LUKE HARRISON $89.95 
2016-05-16COURTESY INSPECTION (FREE) LUKE HARRISON $0.00 
2016-05-16DIAG. LEVEL 1 ELECTRICAL DIAGNOSTIC WORKSHEET-CUSTOMER STATES THE BATTERY LIGHT COMES ON INTERMITTENTLY. WHEN PULLED OVER AND IGNITION SWITCH IS CYCLED IT GOES AWAY. TECH WAS UNABLE TO DUPLICATE CONCERN. TECH LOAD TESTED BATTERY AND ALTERNATOR. BOTH TEST TO BE IN PERFECT OPERATING CONDITION. TERMINALS TESTED GOOD, CLEAN, AND TIGHT. TECH BELIEVES MAYBE THE ALTERNATOR IS OPERATING INTERMITTENTLY HOWEVER WAS UNABLE TO VERIFY. IF PROBLEM BECOMES EASIER TO DUPLICATE TECH RECOMMENDS BRINGING BACK TO VERIFY THE ISSUE.  LUKE HARRISON $0.00 
2016-05-16DIAGNOSTIC TEST - OIL LEAK-POWER STEERING. TECH FOUND THE FITTING ON THE POWER STEERING PUMP RESERVOIR WAS LEAKING. TECH REMOVED FITTING, REPLACED O-RINGS AND SILICONED TOP UPPER O-RING TO HELP SEAL FITTING. RE-CHECKED AND NOW OPERATING AS DESIGNED. DYE IS STILL IN SYSTEM TO MAKE SURE THERE IS NO MORE POWER STEERING LEAKS BELOW THIS NOW REPAIRED LEAK.  LUKE HARRISON $62.18 
2016-05-17FUEL FILTER REPLACMENT- FORD AND MAZDA PREMIUM  LUKE HARRISON $56.31 
2016-05-17TECH FOUND DYE COMING FROM THE FRONT OF THE COMPRESSOR AND RECOMMENDS IT BE REPLACED WITH AN A/C COMPRESSOR WITH CLUTCH TO ENSURE REPAIRED PROPERLY.  LUKE HARRISON $559.86 
2016-05-19WHILE THE A/C COMPRESSOR WAS OFF IT WAS ADVISED TO REPLACE SERPENTINE BELT AND WORN IDLER PULLEY. NO ADDED LABOR WHILE COMPRESSOR WAS OFF.  LUKE HARRISON $107.37 
Sub-total $1,279.62 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $1,376.99 
Tax ($6.85%)$87.65 
Total $1,464.65 
Fee

Payments
Total Payments To Date $1,464.65 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap