Invoice #17432 for (Leilani Victor)
8-003-458-2508
2003 Chevrolet Silverado 2500

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2016-06-29BATTERY ACDELCO STANDARD REPLACEMENT LUKE HARRISON $190.64 
2016-06-23COURTESY INSPECTION (FREE) PLEASE CHECK THE HORN. LUKE HARRISON $0.00 
2016-06-23CUSTOMER STATES THE ENGINE WILL NOT START, PLEASE CHECK AND ADVISE. LUKE HARRISON $0.00 
2016-06-29ENGINE - DIESEL - DURAMAX 6.6L COMPLETE ENGINE RE-BUILD AND OVERHAUL. THIS REPAIR INCLUDES REMOVING ENGINE AND DIS ASSEMBLING TO INSPECT AND COMPLETING ENGINE BUILD AND RE INSTALLATION. INCLUDES TESTING INJECTORS AND TURBO, IF ANY INJECTORS OR TURBO PROBLEMS ARE FOUND ADDITIONAL COSTS WILL APPLY AND WILL BE REQUIRED IN ORDER TO UPHOLD WARRANTY. INCLUDES COMPLETE ENGINE RE BUILD KIT WITH NEW UPGRADED MOHLE PISTONS. ALSO RECOMMENDED BUT NOT INCLUDED IN THIS QUOTE IS ARP HEAD STUDS, AVAILABLE AT ADDITIONAL CHARGE. THIS REPAIR WILL COME WITH A 3 YEAR 36,000 MILE WARRANTY ON PARTS AND LABOR ONLY. WARRANTY DOES NOT COVER ABUSE OR UNAUTHORIZED PERFORMANCE UPGRADES, WARRANTY ALSO DOES NOT COVER BURNT PISTONS OR BURNT HOLES IN PISTONS DUE TO ABUSE OR EXCESSIVE HEAT. ENGINE ALSO INTENDS TO RE USE THE HIGH PRESSURE FUEL INJECTION CP3 PUMP, NEW PUMP WOULD BE ADDITIONAL IF REQUIRED. LUKE HARRISON $9,999.99 
2016-08-17FUEL RETURN LINE BOLTS. LUKE HARRISON $95.28 
2016-06-29HEAD GASKET - ENGINE - DIESEL DURAMAX - ARP HEAD STUD UPGRADE OPTIONAL WITH HEAD GASKET REPAIR AND ENGINE RE BUILD LUKE HARRISON $795.00 
2016-08-12STATE - SAFETY INSPECTION TEST (ONLY)* TYLER SPANGLER $15.00 
2016-07-19TECHNICIAN FOUND DRIVERS ENGINE MOUNT TO BE SEPARATING, PLEASE REPLACE. LUKE HARRISON $161.02 
2016-07-19TECHNICIAN RECOMMENDS REPLACE ALL EIGHT GLOW PLUGS AT TIME OF ENGINE RE-BUILD. LUKE HARRISON $264.40 
2016-08-02TURBO TEST RESULTS CAME BACK WITH INTERNAL DAMAGE.  LUKE HARRISON $700.00 
Sub-total $12,221.33 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $12,318.70 
Total $12,318.70 
* Items marked with a red asterisk are not taxed.
Fee

Payments
Total Payments To Date $12,318.70 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap