Invoice #18736 for (William Farmer)
8-243-102-5824
2006 Chevrolet Silverado 3500

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2017-03-13COURTESY INSPECTION (FREE) CUSTOMER STATES THE TRUCK GOES INTO LIMP MODE WHEN IN TOW HAUL MODE AND PULLING A 10,000LB TRAILER. JONATHAN TAYLOR  $0.00 
2017-03-14TECHNICIAN FOUND THE TRANSMISSION BELL HOUSING TO BE CRACKED, TECHNICIAN STATES SOMEONE HAS PUT SOME TYPE OF EPOXY OVER THE CRACK. TECHNICIAN WILL REQUIRE THE REPLACEMENT OF THE BELL HOUSING. JONATHAN TAYLOR  $0.00 
2017-03-14TECHNICIAN NOTES; BRAKE LIGHT ON BED TOPPER IS NOT WIRED IN, TIRE TREAD IS STARTING TO GET LOW, ENGINE OIL IS DUE BY STICKER, ENGINE ANTIFREEZE IS LOW IN RESERVOIR, HYDROBOOST AND POWER STEERING PRESSURE LINES ARE WET, POWER STEERING FLUID IS LOW, BOTH FRONT AXLE SEALS ARE STARTING TO LEAK, SWAY BAR BUSHINGS ARE WORN, RIGHT REAR SHOCK IS SHOWING SIGNS OF LEAKAGE. JONATHAN TAYLOR  $0.00 
2016-12-21TRANSMISSION - DIESEL - DURAMAX ALLISON TRANSMISSION COMPLETE STOCK EQUIVALANT RE-BUILD AND UPDATE, VALVE BODY UPDATES AND RE-BUILD, COMPLETE RESEAL AND OVERHAUL KIT. CUSTOMER WOULD LIKE TO UPGRADE THE TORQUE CONVERTER TO A SINGLE DISC BILLET CONVERTER.* LUKE HARRISON $2,975.00 
Sub-total $2,975.00 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $3,072.37 
Total $3,072.37 
* Items marked with a red asterisk are not taxed.
Fee

Payments
Total Payments To Date $3,072.37 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap