Invoice #19071 for IDRIVE UTAH (Angela Pierce)
8-524-421-5503
2008 GMC SIERRA 1500

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2017-05-03COURTESY INSPECTION (FREE) LUKE HARRISON $0.00 
2017-05-03CUSTOMER STATES THE ENGINE WAS MAKING A TICKING NOISE, THE VEHICLE WAS AT ANOTHER SHOP AND WAS PARTIALLY TORN DOWN, TECHNICIAN RECOMMENDS RE ASSEMBLE TO PROPERLY DIAGNOSE THE CONCERN. TECHNICIAN RE ASSEMBLED ENGINE ENOUGH TO START AND PROPERLY DIAGNOSE. TECHNICIAN FOUND THERE TO BE A LOUD TICK NOISE THAT APPEARS TO BE TOP END OF THE ENGINE. TECHNICIAN THEN REMOVED THE VALVE COVERS TO INSPECT AND FOUND THERE TO BE A COLLAPSED LIFTER. TECHNICIAN RECOMMENDS REPLACE ALL ACTIVE AND NON ACTIVE LIFTERS, PLEASE INSPECT ALL COMPONENTS AND PERFORM CYLINDER HEAD GASKET REPAIRS AS WELL. TECHNICIAN NOTED DUE TO THE VEHICLE ALREADY BEING TORN DOWN THERE MAY BE PARTS MISSING OR OTHER ISSUES AS A RESULT AND THE PRICE FOR REPAIRS COULD CHANGE ACCORDINGLY. LUKE HARRISON $3,449.13 
2017-05-03TECHNICIAN NOTES; WINDSHIELD IS CRACKED, LEFT FRONT OUTER MARKER LIGHT, TRANSMISSION FLUID IS SLIGHTLY DARK, BRAKE FLUID IS DUE FOR SERVICE, POWER STEERING FLUID IS DARK, TRANSMISSION COOLER LINES SLIGHTLY LEAKING, POWER STEERING PRESSURE HOSE IS SLIGHTLY LEAKING, OIL ADAPTER PLATE IS SLIGHTLY LEAKING, DRIVERS SIDE UPPER BALL JOINT VERY SLIGHT PLAY, SHOCKS ARE ORIGINAL, FRONT BRAKES ARE 4/32", REAR BRAKES ARE 3/32", FRONT DIFFERENTIAL FLUID IS VERY DARK, REAR DIFFERENTIAL FLUID IS VERY DARK, TRANSFER CASE FLUID IS A LITTLE DARK, SERVICE 4X4 LIGHT IS ON. LUKE HARRISON $0.00 
2017-05-03TECHNICIAN RECOMMENDS REPLACE THE SPARK PLUGS AND WIRES AT TIME OF CYLINDER HEAD REPAIRS. LUKE HARRISON $209.74 
2017-05-03TECHNICIAN REMOVED OIL SCREEN FROM UNDER THE OIL PRESSURE SENSOR AND FOUND THERE TO BE BE DEBRIS PRESENT ON THE SCREEN. TECHNICIAN RECOMMENDS REPLACE THE SCREEN AND VALVE LIFTER OIL MANIFOLD ASSEMBLY AT TIME OF CYLINDER HEAD REPAIRS.  LUKE HARRISON $365.77 
Sub-total $4,024.64 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $4,122.01 
Total $4,122.01 
Fee

Payments
Total Payments To Date $4,122.01 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap