Invoice #21230 for (Allison Davies)
8-785-377-8786
2003 Chevrolet Silverado 2500hd

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2018-05-08COURTESY INSPECTION (FREE) LUKE HARRISON $0.00 
2018-07-09CUSTOMER IS SUPPLYING THEIR OWN CP3 PRESSURE PUMP.   $0.00 
2018-07-13CUSTOMER SENT OUT TURBO TO GILLETTE DIESEL ON THEIR OWN AND HAD REPAIRS PERFORMED, CUSTOMER PAID DIRECT TO GILLETTE. LUKE HARRISON $0.00 
2018-05-08CUSTOMER STATES, THERE IS BLOW BY ON CYLINDER #4 AND IT HAS A HIGH BALANCE RATE. PLEASE CHECK AND ADVISE.* LUKE HARRISON $0.00 
2018-05-17DIESEL - CHEVROLET/GMC DURAMAX POWER STEERING LINE REPLACEMENT. PLEASE REMOVE AND SEND OUT TO EVCO FOR CUSTOM HYDRAULIC LINES.* LUKE HARRISON $150.16 
2018-05-17ENGINE - DIESEL - DURAMAX 6.6L COMPLETE ENGINE RE-BUILD AND OVERHAUL. THIS REPAIR INCLUDES REMOVING ENGINE AND DIS ASSEMBLING TO INSPECT AND COMPLETING ENGINE BUILD AND RE INSTALLATION. INCLUDES TESTING INJECTORS. IF ANY INJECTORS OR TURBO PROBLEMS ARE FOUND ADDITIONAL COSTS WILL APPLY AND WILL BE REQUIRED IN ORDER TO UPHOLD WARRANTY (CUSTOMER SENT OUT AND PAID DIRECT FOR THEIR OWN TURBO REPAIRS, THE TURBO WILL NOT CARRY ANY TYPE OF WARRANTY THROUGH OUR FACILITY). INCLUDES COMPLETE ENGINE RE BUILD KIT WITH NEW UPGRADED MOHLE PISTONS. ALSO RECOMMENDED BUT NOT INCLUDED IN THIS QUOTE IS ARP HEAD STUDS, AVAILABLE AT ADDITIONAL CHARGE. THIS REPAIR WILL COME WITH A 3 YEAR 36,000 MILE WARRANTY ON PARTS AND LABOR ONLY. WARRANTY DOES NOT COVER ABUSE OR UNAUTHORIZED PERFORMANCE UPGRADES, WARRANTY ALSO DOES NOT COVER BURNT PISTONS OR BURNT HOLES IN PISTONS DUE TO ABUSE OR EXCESSIVE HEAT. ENGINE ALSO INTENDS TO RE USE THE HIGH PRESSURE FUEL INJECTION CP3 PUMP, NEW PUMP WOULD BE ADDITIONAL IF REQUIRED.* LUKE HARRISON $9,862.98 
Sub-total $10,013.14 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $10,110.51 
Total $10,110.51 
* Items marked with a red asterisk are not taxed.
Fee

Payments
Total Payments To Date $10,110.51 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap