Invoice #21762 for (Marina Vane)
0-215-842-8335
2004 Dodge Ram 2500

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2018-08-03AIR FILTER CLEAN AND RE-CHARGE SERVICE - K&N  TYLER SPANGLER $19.99 
Discount (100.00%)-19.990.00 
2018-08-03ALIGNMENT - FRONT END AUSTIN KALLUNKI $74.99 
2018-07-23COURTESY INSPECTION (FREE) TYLER SPANGLER $0.00 
2018-08-03DIAGNOSTIC AND TEST - COOLING SYSTEM PRESSURE - TECHNICIAN NOTES, THE COOLANT LEAK IS COMING FROM THE WATER PUMP AND WILL NEED TO BE REPLACED TO VERIFY THERE ARE NO OTHER LEAKS IN THE COOLING SYSTEM. TECHNICIAN ALSO NOTICED THE SERPENTINE BELT HAS MAJOR CRACKING AND RECOMMENDS REPLACING THE BELT AT THE TIME OF THE WATER PUMP FOR NO ADDITIONAL LABOR. TYLER SPANGLER $420.70 
2018-07-23DIAGNOSTIC TEST - OIL LEAK - CUSTOMER BELIEVES THE FLUID LEAKING IS POWER STEERING FLUID. PLEASE CHECK AND ADVISE. - TECHNICIAN NOTES, THE POWER STEERING LEAK IS DRIPPING FROM THE HYDRO BOOST. TECHNICIAN RECOMMENDS REPLACING THE HYDRO BOOST.  TYLER SPANGLER $633.72 
2018-08-03DIAGNOSTIC TEST - OIL LEAK - TRANSMISSION LEAK - TECHNICIAN NOTES, THE TRANSMISSION PAN IS LEAKING FROM THE GASKET. TECHNICIAN RECOMMENDS REPLACING THE PAN GASKET AND RECHECKING FOR OTHER LEAKS.  TYLER SPANGLER $296.90 
2018-08-03DIESEL - DODGE CUMMINS - PREMIUM OIL CHANGE SERVICE, SYNTHETIC BLEND OIL USED AND RECOMMENDED SERVICE INTERVAL OF 5,000 MILES. TYLER SPANGLER $89.99 
2018-08-03DIESEL - FUEL FILTER REPLACEMENT - 5.9 CUMMINS  TYLER SPANGLER $75.00 
2018-08-03PLEASE INSTALL CUSTOMER SUPPLIED GRILLE TYLER SPANGLER $47.59 
2018-08-03REAR BRAKE PAD AND ROTOR STANDARD REPLACEMENT, CHECK AND MEASURE ROTORS, CLEAN AND LUBRICATE CALIPERS AND SLIDERS. - TECHNICIAN NOTES, ONCE DISASSEMBLED TECHNICIAN NOTICED THE RUBBER BOOTS THAT GO OVER THE SLIDERS ON THE BRAKE CALIPER WERE WEATHER ROTTED AND NEED TO BE REPLACED.  TYLER SPANGLER $315.33 
2018-08-03TECHNICIAN NOTES, THE UPPER BALL JOINTS ON BOTH SIDES HAVE EXCESSIVE PLAY AND THE LOWER BALL JOINTS HAVE MINOR PLAY AS WELL. TECHNICIAN IS RECOMMENDING REPLACING UPPER AND LOWER BALL JOINTS. TYLER SPANGLER $764.27 
2018-08-03TIRES - DISMOUNT FOUR TIRES, MOUNT AND BALANCE FOUR TIRES. TYLER SPANGLER $95.60 
Discount (100.00%)-95.60.00 
Sub-total $2,718.48 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $2,815.85 
Tax ($6.57%)$186.22 
Total $3,002.07 
Total Discount $115.59 
Fee

Payments
Total Payments To Date $3,002.07 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap