Invoice #21810 for (Liam Lloyd)
8-631-217-1370
2004 GMC Sierra 2500hd

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2018-08-15BRAKE PAD STANDARD REPLACEMENT, CHECK AND MEASURE ROTORS, CLEAN AND LUBRICATE CALIPERS AND SLIDERS. FRONT BRAKE PADS. PART ONLY FOR CUSTOMER SATISFACTION. JONATHAN TAYLOR  $39.68 
2018-08-01COURTESY INSPECTION (FREE). CUSTOMER WOULD LIKE THE CTS UPDATED, EFI LIVE RE-TUNED FOR PERFORMANCE TRANSMISSION BY ZACH AT STARLITE DIESEL, A LARGER DOWN PIPE INSTALLED WHILE TRANSMISSION IS REMOVED, AND THE REAR MAIN SEAL CHECKED WHILE TRANSMISSION IS REMOVED.  JONATHAN TAYLOR  $0.00 
2018-08-08DRIVERS SIDE TRANSMISSION DIPSTICK TUBE. JONATHAN TAYLOR  $104.99 
2018-08-08PLEASE INSTALL 4 PIN/7 PIN TRAILER WIRING CONNECTOR. ADAM EGBERT $53.21 
2018-08-08PLEASE INSTALL MBRP DOWNPIPE WHILE TRANSMISSION IS OUT. ADAM EGBERT $169.99 
2018-08-01PLEASE UPDATE EDGE INSIGHT. AUSTIN KALLUNKI $0.00 
2018-08-01TRANSMISSION - ALLISON - PLEASE INSTALL FLEECE UPGRADED TRANSMISSION LINE SET. (FLEECE FPE-TL-LBZ-LMM). ADAM EGBERT $613.84 
2018-08-01TRANSMISSION - DIESEL - DURAMAX 2001-2010 ALLISON TRANSMISSION *STAGE 1 COMPLETE PERFORMANCE RE-BUILD AND UPDATE, INCLUDES HIGH PERFORMANCE RACE CLUTCHES, BILLET HD TORQUE CONVERTER, SHIFT UPGRADE PACKAGE, VALVE BODY UPDATES AND RE-BUILD, COMPLETE RESEAL AND OVERHAUL KIT. THIS BUILD PRICE IS FOR WEARABLE ITEMS AND UPGRADED PARTS COMMON ON MOST BUILDS HARD PART DAMAGE WILL REQUIRE ADDITIONAL COSTS THAT CAN ONLY BE DETERMINED ONCE TRANSMISSION IS DIS ASSEMBLED. LUKE HARRISON $3,795.00 
Discount-300.000.00 
2018-08-01TRANSMISSION - DIESEL - DURAMAX ALLISON HD AUXILIARY COOLER UPGRADE TO SETRAB PERFORMANCE HIGH FLOW COOLER ADAM EGBERT $460.00 
2018-08-16TYSON REQUESTED HIS TUNE BE ENHANCED SINCE HE NOW HAS A BUILT TRANSMISSION. LUKE AGREED TO INSTALL TUNES FREE OF CHARGE HOWEVER STARLITE DIESEL CHARGES $50 THEREFORE THE COST WILL BE $50.  LUKE HARRISON $50.00 
Sub-total $4,986.71 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $5084.08 
Tax ($6.46%)$341.59 
DIPSTICK TUBE FREIGHT $20.00 
Total $5445.67 
Total Discount $300.00 
Fee

Payments
Total Payments To Date $5445.67 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap