Invoice #21956 for (Sadie Saunders)
8-561-470-7215
2007 Chevrolet SILVERADO 2500HD

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2018-08-22COURTESY INSPECTION (FREE) LUKE HARRISON $0.00 
2018-08-28TECHNICIAN NOTES; WIPERS ARE STREAKING, RIGHT REAR TURN SIGNAL OUT, TIRES ARE SEVERELY WORN, NO ENGINE OIL STICKER PRESENT INDICATING WHEN OIL CHANGE IS DUE, BRAKE FLUID IS DISCOLORED AND DUE FOR SERVICE, POWER STEERING FLUID IS A LITTLE LOW AND DARK, POWER STEERING PRESSURE LINES ARE SLIGHTLY SEEPING, RIGHT SIDE VALVE COVER IS SLIGHTLY SEEPING, AIR FILTER IS MISSING, BATTERIES ARE DYING REALLY FAST, RIGHT SIDE TIE ROD HAS PLAY, TRANSFER CASE SLIP YOKE IS WET, RIGHT FRONT AXLE SEAL IS LEAKING, FRONT BRAKES ARE 4/32", REAR BRAKES ARE 6/32", FUEL FILTER IS DUE BY MILEAGE, FRONT DIFFERENTIAL CASE HALF IS LEAKING, FRONT DIFFERENTIAL FLUID IS LOW, TRANSFER CASE FLUID IS BLACK, P154B INTAKE AIR HEATER CODE IS STORED, P154D INTAKE AIR TEMPERATURE CODE STORED, DRIVERS HEAD LIGHT HOUSING IS BROKEN, WATER IN RIGHT REAR TAIL LIGHT, CODES P064C AND P0671 ARE STORED AS CURRENT, C0040 RIGHT FRONT WHEEL SPEED FAULT STORED AS CURRENT. TREY GALE $0.00 
2018-08-22TRANSMISSION - DIESEL - DURAMAX 2001-2010 ALLISON TRANSMISSION *STAGE 2 COMPLETE PERFORMANCE RE-BUILD AND UPDATE, INCLUDES HIGH PERFORMANCE RACE CLUTCHES, BILLET TRIPLE DISC HD TORQUE CONVERTER, SHIFT UPGRADE PACKAGE, VALVE BODY UPDATES AND RE-BUILD, COMPLETE RESEAL AND OVERHAUL KIT, PUMP PRESSURE MODIFICATION KIT. THIS BUILD PRICE IS FOR WEARABLE ITEMS AND UPGRADED PARTS COMMON ON MOST BUILDS HARD PART DAMAGE WILL REQUIRE ADDITIONAL COSTS THAT CAN ONLY BE DETERMINED ONCE TRANSMISSION IS DIS ASSEMBLED. TECHNICIAN FOUND THE FLUID PUMP TO BE BROKEN AND REQUIRED REPLACEMENT OF PUMP. LUKE HARRISON $5145.00 
Discount-300.000.00 
Sub-total $4,845.00 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $4,942.37 
Tax ($6.45%)$331.88 
TOW SUBLET THROUGH MATT WALKER FROM HEBER $125.00 
Total $5399.25 
Total Discount $300.00 
Fee

Payments
Total Payments To Date $5399.25 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap