Invoice #22601 for (Sloane Kelly)
1-276-772-1310
2003 GMC 2500 HD

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2018-11-29AIR FILTER REPLACEMENT (APPLIES TO MOST VEHICLES) LUKE HARRISON $24.99 
2018-11-29COURTESY INSPECTION (FREE) LUKE HARRISON $0.00 
2018-11-29CUSTOMER STATES, THE BACK UP CAMERA HAS LINES GOING THROUGH IT LIKE THE SHIELDED WIRE IS BROKEN OR NOT WORKING. PLEASE CHECK AND ADVISE. TECHNICIAN NOTES, WITH THE BATTERIES BEING SO WEAK WE CAN'T FULLY TEST THE ELECTRICAL SYSTEM. TECHNICIAN RECOMMENDS REPLACING THE BATTERIES AND CHECKING FOR FURTHER ISSUES AT THAT POINT. ONCE THE NEW BATTERIES WERE INSTALLED THE BACK UP CAMERA WAS STILL DOING THE SAME THING. TECHNICIAN RECOMMENDS TAKING IT TO A STEREO SHOP OR SOMEWHERE THAT CAN DIAGNOSE THE BACKUP CAMERA FURTHER. LUKE HARRISON $0.00 
2018-11-29CUSTOMER STATES, THEY HIT DEBRIS WHILE DRIVING AND NOW THE TRAILER WIRING HAS NO SIGNAL GOING OUT. PLEASE CHECK AND ADVISE. TECHNICIAN NOTES, THERE WERE SEVERAL FUSES BLOWN. ONCE INSTALLED EVERYTHING IS TESTING AT 100%. THE SHORT CAUSING THE FUSES TO BLOW IS LIKELY A PROBLEM WITH THE WIRING ON THE TRAILER.  LUKE HARRISON $47.59 
2018-11-29DIESEL - OIL CHANGE DURAMAX PREMIUM SERVICE, SYNTHETIC BLEND OIL USED AND RECOMMENDED SERVICE INTERVAL OF 5,000 MILES. TREY GALE $89.99 
2018-11-29FUEL FILTER - DIESEL - DURAMAX 2001-2016 REPLACMENT LUKE HARRISON $115.27 
2018-11-29TECHNICIAN NOTES, ONE OF THE COOLANT FITTINGS THAT CONNECT TO THE HEATER CORE AT THE FIREWALL HAS A DRIPPING LEAK. TECHNICIAN RECOMMENDS REPLACING THAT FITTING AND THE HOSE THAT IT CONNECTS TO. ONCE DISASSEMBLED TECHNICIAN NOTES, THERE IS A HAIRLINE CRACK COMING OFF THE CONNECTION ON THE HEATER CORE. TECHNICIAN WAS ABLE TO BYPASS THE FITTING AND CONNECT DIRECTLY TO THE HEATER CORE PORT AND GET THE LEAK TO STOP. TO FIX IT PROPERLY IT WOULD NEED A REPLACEMENT HEATER CORE. LUKE HARRISON $67.72 
2018-11-29TWO BATTERY ACDELCO STANDARD REPLACEMENT. THE PRICE FOR EACH BATTERY GROUP SIZE IS DIFFERENT, PLEASE IDENTIFY GROUP SIZE AND ADJUST PRICE FROM THIS JOB ACCORDINGLY. OUR BATTERIES HAVE A 36 MONTH PART ONLY WARRANTY FROM THE DATE IT WAS MANUFACTURED (78VPG) LUKE HARRISON $302.56 
Sub-total $648.10 
Hazardous Materials Disposal$29.16 
Shop Supplies$35.65 
Sub-total $712.91 
Tax ($6.85%)$44.40 
Total $757.31 
Fee

Payments
Total Payments To Date $757.31 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap