Invoice #23489 for (Jennifer Vallory)
0-526-137-3881
2004 GMC SIERRA 2500 HD

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2019-03-25COURTESY INSPECTION (FREE) - TECHNICIAN NOTES, THE WIPER BLADES ARE SLIGHTLY STREAKY, THE RIGHT FOG LIGHT AND RIGHT LICENSE PLATE LIGHTS ARE BURNT OUT, THE LEFT LICENSE PLATE LIGHT IS MISSING THE HOUSING AND THE PIGTAIL, THE COOLANT WAS SLIGHTLY LOW, THE POWER STEERING FLUID IS SLIGHTLY DARK, THE RIGHT UPPER BALL JOINT HAD EXCESSIVE PLAY AND WOULD FAIL A SAFETY THE OTHER THREE BALL JOINTS HAVE MINOR PLAY AND SHOULD BE REPLACED AS WELL, THE IDLER AND PITMAN ARMS HAVE MINOR PLAY AND MAY CAUSE THE TIRES TO WEAR UNEVEN, THERE IS AN INNER TIE ROD AND AN OUTER TIE ROD THAT HAVE EXCESSIVE PLAY AND SHOULD BE REPLACED, THE FRONT BRAKE PADS ARE AT 7/32", THE REAR BRAKE PADS ARE AT 1/32" AND HAVE A LIP ON THE ROTOR THE PADS AND ROTORS SHOULD BE REPLACED, AND THERE IS A TRANSMISSION COOLER LINE GOING FROM THE TRANSMISSION TO THE RADIATOR THAT IS LEAKING AND SHOULD BE REPLACED AS WELL. JONATHAN TAYLOR  $0.00 
2019-03-25LIGHT BULB REPLACEMENT (1) - RIGHT LICENSE PLATE LIGHT BULB. JONATHAN TAYLOR  $11.99 
2019-03-25TECHNICIAN NOTES, THERE IS A TRANSMISSION COOLER LINE LEAKING GOING FROM THE TRANSMISSION TO THE RADIATOR. TECHNICIAN RECOMMENDS REPLACING THE LINE TO UPHOLD THE WARRANTY ON THE TRANSMISSION. JONATHAN TAYLOR  $195.63 
2019-03-25TRANSMISSION - DIESEL - DURAMAX 2001-2010 ALLISON TRANSMISSION *STAGE 1 COMPLETE PERFORMANCE RE-BUILD AND UPDATE, INCLUDES HIGH PERFORMANCE RACE CLUTCHES, BILLET HD TORQUE CONVERTER, SHIFT UPGRADE PACKAGE, VALVE BODY UPDATES AND RE-BUILD, COMPLETE RESEAL AND OVERHAUL KIT. THIS BUILD PRICE IS FOR WEARABLE ITEMS AND UPGRADED PARTS COMMON ON MOST BUILDS HARD PART DAMAGE WILL REQUIRE ADDITIONAL COSTS THAT CAN ONLY BE DETERMINED ONCE TRANSMISSION IS DIS ASSEMBLED. JONATHAN TAYLOR  $3,795.00 
Sub-total $4,002.62 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $4,099.99 
Tax ($6.85%)$274.18 
Total $4,374.17 
Fee

Payments
Total Payments To Date $4,374.17 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap