Invoice #24358 for (Mark Giles)
3-828-216-7662
2002 Ford F-250

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2019-06-25ALIGNMENT - FRONT END AUSTIN KALLUNKI $74.99 
2019-06-25BELT REPLACEMENT - REPLACE SERPENTINE BELT. (APPLICABLE TO MOST VEHICLES, MUST VERIFY BELT PRICE). PLEASE INSPECT PULLEYS AND TENSIONERS AT THIS TIME AND REPLACE AS NEEDED. TYLER SPANGLER $123.80 
2019-06-25COURTESY INSPECTION (FREE) - TECHNICIAN NOTES, THERE IS SEVERAL OIL LEAKS ON THE ENGINE, THE AIR FILTER IS SLIGHTLY DIRTY AND IS A CLEANABLE AIR FILTER, THE SERPENTINE BELT IS CRACKING AND SHOULD BE REPLACED TO PREVENT ISSUES IN THE FUTURE, THE TIE ROD CONNECTING TO THE PITMAN ARM IS LOOSE, THE FRONT AND REAR BRAKE PADS ARE AT 5/32", AND THERE IS A LEAK COMING FROM THE PINION SEAL ON THE REAR DIFFERENTIAL. DALLAS MCINTYRE $0.00 
2019-06-25TECHNICIAN NOTES, THE STEERING STABILIZER IS LEAKING AND NO LONGER ASSISTING. TECHNICIAN RECOMMENDS REPLACING THE STOCK STEERING STABILIZER WITH AN AFTER MARKET PRO COMP DUAL STEERING STABILIZER. TYLER SPANGLER $294.59 
2019-06-25TECHNICIAN NOTES, THE TIE ROD CONNECTING TO THE PITMAN ARM IS LOOSE AND SHOULD BE REPLACED.  TYLER SPANGLER $211.34 
Sub-total $704.72 
Shop Supplies$45.81 
Sub-total $750.53 
Tax ($7.25%)$51.09 
Total $801.62 
Fee

Payments
Total Payments To Date $801.62 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap