Invoice #24482 for (Keira Hilton)
0-102-812-8483
2006 Dodge RAM 1500

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2019-07-31BATTERY ACDELCO STANDARD REPLACEMENT. THE PRICE FOR EACH BATTERY GROUP SIZE IS DIFFERENT, PLEASE IDENTIFY GROUP SIZE AND ADJUST PRICE FROM THIS JOB ACCORDINGLY. OUR BATTERIES HAVE A 36 MONTH PART ONLY WARRANTY FROM THE DATE IT WAS MANUFACTURED   $119.99 
2019-08-14BRAKE PAD STANDARD REPLACEMENT, CHECK AND MEASURE ROTORS, CLEAN AND LUBRICATE CALIPERS AND SLIDERS. (MUST VERIFY APPLICATION AND PRICING APPLIES TO SELECTED VEHICLE) REAR BRAKE PADS ARE METAL ON METAL. UPON REMOVAL TECHNICIAN THE DRIVERS SIDE PARK BRAKE SHOES TO BE METAL ON METAL. PLEASE REPLACE PARK BRAKE SHOES AT TIME OF SERVICE. DALLAS MCINTYRE $468.68 
2019-07-08COURTESY INSPECTION (FREE) TREY GALE $0.00 
2019-07-08CUSTOMER STATES, THEY HAVE STARTED REPLACING AN ENGINE AND WOULD LIKE A PRICE TO FINISH INSTALLING THE ENGINE IN PLACE. TECHNICIAN NOTED UPON INITIAL INSPECTION THE ENGINE WAS SAT IN PLACE BUT THE TORQUE CONVERTER AND FLEX PLATE WERE NOT INSTALLED ON THE ENGINE. TECHNICIAN REMOVED THE ENGINE AND INSTALLED THE FLEX PLATE AND TORQUE CONVERTER AND BEGAN INSTALLATION OF THE ENGINE. TECHNICIAN NOTED THERE WERE LOTS OF BOLTS MISSING ALONG THE WAY THAT REQUIRED PURCHASE OF NEW. TECHNICIAN ALSO NOTED THE EGR TUBE WAS MISSING AND REQUIRED PURCHASE. PLEASE COMPLETE INSTALL OF ENGINE AND ADD FLUIDS AND OIL FILTER. START ENGINE AND TEST DRIVE TO INSPECT. THE ENGINE BEING INSTALLED WAS SUPPLIED BY THE CUSTOMER, THEREFORE THERE WILL BE NO WARRANTY ON THIS REPAIR.   $1,740.26 
2019-08-13STATE - EMISSIONS TEST (ONLY)* KYLE METCALF $35.00 
2019-08-14TECHNICIAN NOTES; BLOWER MOTOR IS MAKING NOISE, FRONT TIRES ARE BADLY CUPPED, AIR FILTER IS SLIGHTLY DIRTY, FRONT BRAKE PADS ARE AT 4/32", REAR BRAKE PADS ARE METAL ON METAL. TREY GALE $0.00 
2019-08-14TIRES - ROTATE AND CHECK TIRE PRESSURES DALLAS MCINTYRE $17.99 
Discount (100.00%)-17.9910.00 
Sub-total $2,363.93 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $2,461.30 
Tax ($7.19%)$168.85 
EGR TUBE FREIGHT $15.00 
TOW CHARGE $60.00 
Total $2,705.15 
Total Discount $17.99 
* Items marked with a red asterisk are not taxed.
Fee

Payments
Total Payments To Date $2,705.15 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap