Invoice #26232 for (Boris Edley)
6-126-720-1067
2005 Chevrolet Silverado 2500hd

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2020-02-18COURTESY INSPECTION (FREE) DALLAS MCINTYRE $0.00 
2020-02-21TECHNICIAN NOTES, WHEN REMOVING THE LOWER TRANSMISSION COOLER LINE THE FLARED PORTION BROKE OFF AND REMAINED IN THE QUICK CONNECT FITTING THAT MOUNTS IN THE SIDE OF THE TRANSMISSION. WE WILL NEED TO REPLACE THE LINE AND THE QUICK CONNECT FITTING. MATT WALKER $245.68 
2020-02-19TECHNICIAN NOTES; WINDSHIELD IS CRACKED, WIPER BLADES ARE TORN, HYDRO BOOST APPEARS TO BE LEAKING, AIR FILTER IS A LITTLE DIRTY, SERPENTINE BELT IS CRACKING, SLIGHT PLAY IN FRONT END STEERING, FRONT BRAKE PADS ARE AT 5/32", REAR BRAKE PADS ARE AT 2/32", FUEL FILTER IS DUE EVERY 15K MILES, SERVICE AIR BAG LIGHT IS ON, ENGINE OIL LEAKS PRESENT, FRONT DIFFERENTIAL AND REAR DIFFERENTIAL FLUIDS ARE VERY DARK, TRANSFER CASE FLUID IS VERY DARK. DALLAS MCINTYRE $0.00 
2020-02-10TRANSMISSION - DIESEL - DURAMAX 2001-2010 ALLISON TRANSMISSION *STAGE 1 COMPLETE PERFORMANCE RE-BUILD AND UPDATE, INCLUDES HIGH PERFORMANCE RACE CLUTCHES, BILLET HD TORQUE CONVERTER, SHIFT UPGRADE PACKAGE, VALVE BODY UPDATES AND RE-BUILD, COMPLETE RESEAL AND OVERHAUL KIT. THIS BUILD PRICE IS FOR WEARABLE ITEMS AND UPGRADED PARTS COMMON ON MOST BUILDS HARD PART DAMAGE WILL REQUIRE ADDITIONAL COSTS THAT CAN ONLY BE DETERMINED ONCE TRANSMISSION IS DIS ASSEMBLED. LUKE HARRISON $3,795.00 
Sub-total $4,040.68 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $4,138.05 
Tax ($7.25%)$292.95 
Total $4,431.00 
Fee

Payments
Total Payments To Date $4,431.00 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap