Invoice #26717 for (David Dempsey)
3-822-202-5175
2003 Chevrolet Tahoe

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2020-04-231 - TRANSMISSION - CHEVROLET REMOVE AND OVERHAUL RELIABILITY UPGRADED BUILD 4L60E, THIS BUILD COMES WITH A 3 YEAR 36,000 MILE WARRANTY VALID ONLY AT OUR FACILITY. (TOWING NOT INCLUDED) A RE-CHECK IS REQUIRED AFTER 1,000 MILES. IF THERE IS HARD PART DAMAGE FOUND PRICE FOR PARTS MAY BE ADDITIONAL. LUKE HARRISON $2,295.00 
2020-04-272 - TECHNICIAN NOTES, ALL THREE TRANSMISSION COOLER LINES ARE WET. THEY MUST BE REPAIRED IN ORDER TO UPHOLD THE WARRANTY ON THE TRANSMISSION. ASHTON ORR $271.65 
2020-04-27COURTESY INSPECTION (FREE) - TECHNICIAN NOTES, THE WINDSHIELD IS CRACKED, THE TRANSMISSION FLUID IS DARK, THE BRAKE FLUID IS TURNING GREEN, THE ENGINE OIL IS SLIGHTLY DARK, THE VALVE COVERS ARE WET, THE AXLE SEALS ARE WET AND STARTING TO LEAK, THE OIL PAN IS WET, THE REAR ENGINE COVER IS WET, THE TUNE UP IS DUE BY THE MILES, THE WATER PUMP IS STARTING TO LEAK, THE IDLER AND PITMAN ARMS BOTH HAVE PLAY, ALL FOUR SHOCKS ARE WET, THE FRONT BRAKE PADS ARE AT 4/32", THE REAR BRAKE PADS ARE AT 5/32", ALL THREE TRANSMISSION COOLER LINES ARE WET, AND THE REAR DRIVE LINE REAR U-JOINT IS GETTING STIFF AND STARTING TO SEIZE. ASHTON ORR $0.00 
Sub-total $2,566.65 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $2,664.02 
Tax ($7.25%)$186.08 
Total $2,850.10 
Fee

Payments
Total Payments To Date $2,850.10 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap