Invoice #27069 for (Nicholas Johnson)
6-771-222-3162
2003 Dodge Ram 2500

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2020-06-081. TRANSMISSION - DIESEL - STAGE 1 DODGE TRANSMISSION 47RE AND 48RE COMPLETE PERFORMANCE RE-BUILD WITH BILLET KIT. ALSO INCLUDED IN THIS BUILD IS TO REMOVE THE ONE WAY CHECK VALVE IN ORDER TO ENSURE CONSTANT FLOW THROUGH THE COOLER. TRANSMISSIONS WITH MORE THAN 100K MILES WILL ALSO REQUIRE A NEW VALVE BODY IN ADDITION TO THIS REPAIR (COMES WITH NEW GOVERNER PRESSURE SENSOR AND TRANSDUCER). THIS BUILD PRICE IS FOR WEARABLE ITEMS AND UPGRADED PARTS COMMON ON MOST BUILDS HARD PART DAMAGE WILL REQUIRE ADDITIONAL COSTS THAT CAN ONLY BE DETERMINED ONCE TRANSMISSION IS DIS ASSEMBLED. LUKE HARRISON $3,686.99 
2020-06-082. TRANSMISSION - DIESEL - DODGE 48RE HD VALVE BODY REQUIRED ON PERFORMANCE BUILDS WITH OVER 100K MILES LUKE HARRISON $610.16 
2020-06-084. TRANSMISSION - DIESEL - DODGE CUMMINS - FLEXPLATE UPGRADE - BD HD FORGED 1500 FT POUNDS OF TORQUE FLEX PLATE. (PART ONLY)   $375.95 
2020-06-225. TECHNICIAN NOTES, ONCE WE REMOVED THE FLEX PLATE ON THE BACK SIDE OF THE ENGINE WE NOTICED A VERY MINOR SEEP COMING FROM THE REAR CRANKSHAFT SEAL. TECHNICIAN RECOMMENDS REPLACING IT WHILE THE TRANSMISSION IS OUT. TYLER SPANGLER $186.22 
2020-06-096. COURTESY INSPECTION (FREE) - TECHNICIAN NOTES, THE ENGINE OIL WAS SLIGHTLY LOW, THE TRANSMISSION FLUID WAS VERY DARK, THE UPPER AND LOWER VALVE COVERS WERE LEAKING, THE AIR FILTER IS DIRTY AND IS CLEANABLE, THE WATER PUMP HAD COOLANT RESIDUE AROUND IT, ALL FOUR BALL JOINTS HAVE MOVEMENT, THE FRONT BRAKE PADS ARE AT 4/32", THE REAR BRAKE PADS ARE AT 10/32", THE FUEL FILTER IS DUE BY THE MILES, AND THE LEFT FRONT AXLE SEAL IS LEAKING. TYLER SPANGLER $0.00 
Sub-total $4,859.32 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $4,956.69 
Tax ($7.25%)$352.30 
Total $5308.99 
Fee

Payments
Total Payments To Date $5308.99 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap