Invoice #27104 for (Alessandra Dunbar)
7-613-827-7032
2012 Jeep WRANGLER

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2020-06-15ALIGNMENT - FRONT END AUSTIN KALLUNKI $74.99 
2020-06-15COURTESY INSPECTION (FREE) - TECHNICIAN NOTES, THE LEFT VALVE COVER IS LEAKING, THE AIR FILTER IS DIRTY AND CLEANABLE, THE FRONT BRAKE PADS ARE AT 8/32", THE REAR BRAKE PADS ARE AT 6/32", AND THERE IS SEVERAL ITEMS ON THE FRONT END STEERING LOOSE. ASHTON ORR $0.00 
2020-06-16CUSTOMER STATES, THE CHECK ENGINE LIGHT IS ON. TECHNICIAN NOTES, THE STORED CODE WAS A P0394 FOR CAMSHAFT POSITION SENSOR B CIRCUIT INTERMITTENT BANK 2. TECHNICIAN CHECKED THE SENSOR AND VERIFIED IT WAS GETTING POWER, GROUND AND SIGNAL TO THE SENSOR. TECHNICIAN BELIEVES THE SENSOR IS BAD. IT IS ALSO POSSIBLE THERE IS A ACTUAL ISSUE WITH THE CAM SHAFT. TECHNICIAN RECOMMENDS INSPECTING FOR DAMAGE AT THE TIME OF THE VALVE COVER LEAK REPAIR OR REPLACING THE SENSOR AND RECHECKING TO SEE IF THE CODE RETURNS. **THE CUSTOMER HAS DECLINED REPAIRS, THIS CHARGE IS FOR THE DIAGNOSIS PREFORMED** ASHTON ORR $51.09 
2020-06-15CUSTOMER STATES, THE STEERING WHEEL SHAKES BADLY AT ABOUT 40 MPH. PLEASE CHECK AND ADVISE. TECHNICIAN WENT AND DROVE THE VEHICLE AND WAS ABLE TO DUPLICATE THE CONCERN. TECHNICIAN BELIEVES THIS ISSUE IS THE START OF A DEATH WOBBLE ISSUE. TECHNICIAN CHECKED THE FRONT END AND FOUND ALL FOUR BALL JOINTS AS WELL AS SEVERAL TIE ROD ENDS TO HAVE MOVEMENT. (PLEASE SEE SEPARATE JOBS FOR FURTHER DETAILS) TECHNICIAN RECOMMENDS REPLACING ALL OF THE LOOSE PARTS AND ALIGNING THE VEHICLE BEFORE RECHECKING TO SEE IF THE ISSUE RETURNS. ASHTON ORR $0.00 
2020-06-15CUSTOMER STATES, THERE IS A GRINDING NOISE WHILE DRIVING IN FOUR WHEEL HIGH. PLEASE CHECK AND ADVISE. TECHNICIAN NOTES, THE NOISE IS COMING FROM EXCESSIVE MOVEMENT ON THE TRANSFER CASE U-JOINT ON THE FRONT DRIVE LINE. TECHNICIAN NOTES, THAT U-JOINT IS NON SERVICEABLE. TECHNICIAN RECOMMENDS REPLACING THE FRONT DRIVE LINE WITH AN UPDATED PART THAT INCLUDES SERVICEABLE U-JOINTS. TREY GALE $1,106.49 
2020-06-15TECHNICIAN NOTES, THE TIE RODS THAT CONNECT BOTH KNUCKLES HAVE EXCESSIVE MOVEMENT. AS WELL AS THE TIE ROD THAT CONNECTS AT THE RIGHT KNUCKLE FROM THE PITMAN ARM. TECHNICIAN RECOMMENDS REPLACING ALL THREE AND RECHECKING THE FRONT END BEFORE AN ALIGNMENT. ASHTON ORR $541.39 
2020-06-15TECHNICIAN NOTES, THE UPPER AND LOWER BALL JOINTS ON BOTH SIDES HAVE EXCESSIVE MOVEMENT AND SHOULD BE REPLACED. ASHTON ORR $971.10 
Sub-total $2,745.05 
Shop Supplies$49.11 
Sub-total $2,794.16 
Tax ($7.25%)$199.02 
Total $2,993.18 
Fee

Payments
Total Payments To Date $2,993.18 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap