Quote #27452 for (Liam Lloyd)
8-631-217-1370
2004 GMC Sierra 2500hd

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:
Change to an RO      Change to an Invoice

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount Delete?Decline?
2020-12-30COURTESY INSPECTION (FREE) TECHNICIAN NOTES; RIGHT PLATE LIGHT OUT, BRAKE FLUID HAS GREEN TINT, STEERING GEAR BOX IS LEAKING, RIGHT FRONT OF ENGINE HAS RESIDUE FROM CRANKCASE VENT, FRONT BRAKE PADS ARE AT 12/32", REAR BRAKE PADS ARE AT 6/32", FUEL FILTER RECOMMENDED EVERY 15K MILES, DRIVERS SIDE FRONT AXLE SEAL IS LEAKING, TRANSFER CASE FLUID IS DARK. TYLER SPANGLER $0.00 X%
2020-12-14DIESEL - DURAMAX - PLEASE INSTALL 8 BOSCH RE MANUFACTURED FUEL INJECTORS. THIS REPAIR WILL COME WITH A 12 MONTH 12,000 MILE WARRANTY ON PARTS AND LABOR ONLY AND IS ONLY AVAILABLE THROUGH OUR FACILITY. TECHNICIAN NOTE; ALL EIGHT INJECTORS CAME BACK WITH LEAKING NOZZLES, "CONSTANT DRIPS FROM ALL EIGHT". TYLER SPANGLER $2,302.80 X%
2020-12-14HEAD GASKET - DIESEL - DURAMAX PLEASE REMOVE CYLINDER HEADS AND INSPECT FOR DAMAGE. CLEAN CHECK AND MILL CYLINDER HEADS AND RE INSTALL USING NEW GASKET SET. ARP HEAD STUDS ARE RECOMMENDED AT TIME OF REPAIR AND WILL BE AN ADDITIONAL COST. ESTIMATE FOR REPAIR MAY CHANGE DEPENDING UPON EXTENT OF DAMAGE ONCE DIS ASSEMBLED. TECHNICIAN NOTED 4 INJECTOR CUPS WERE NOTED TO HAVE DAMAGE, PLEASE REPLACE IN ADDITION TO REPAIR.* TYLER SPANGLER $4,499.18 X%
Discount-1000.000.00  
2020-12-14HEAD GASKET - ENGINE - DIESEL DURAMAX - ARP HEAD STUD UPGRADE OPTIONAL WITH HEAD GASKET REPAIR AND ENGINE RE BUILD* TYLER SPANGLER $795.00 X%
2020-12-28PLEASE INSTALL CUSTOMERS SUPPLIED DRIVERS SIDE EXHAUST MANIFOLD. TYLER SPANGLER $0.00 X%
2020-12-28PLEASE INSTALL WATER PUMP AT TIME OF CYLINDER HEAD REPAIRS. TYLER SPANGLER $233.90 X%
2020-12-28PLEASE MODIFY TUNING ONCE JOB IS COMPLETE. LUKE HARRISON $0.00 X%
2020-12-14PLEASE PULL TURBO TO UPGRADE AT TIME OF REPAIRS. INSTALL 63MM COMPRESSOR WHEEL AND MACHINE HOUSING.* TYLER SPANGLER $719.39 X%
Sub-total $7,550.27  
Hazardous Materials Disposal$58.26  
Sub-total $7,608.53  
Tax ($7.25%)$183.91  
Total $7,792.44  
Total Discount $1,000.00  
* Items marked with a red asterisk are not taxed.

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap