Invoice #28641 for (Adina Ebbs)
5-050-817-6124
2002 Chevrolet Silverado 2500hd

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2021-02-23A. TRANSMISSION - DIESEL - DURAMAX 2001-2010 ALLISON TRANSMISSION *STAGE 2 COMPLETE PERFORMANCE RE-BUILD AND UPDATE, INCLUDES HIGH PERFORMANCE RACE CLUTCHES, BILLET TRIPLE DISC HD TORQUE CONVERTER, SHIFT UPGRADE PACKAGE, VALVE BODY UPDATES AND RE-BUILD, COMPLETE RESEAL AND OVERHAUL KIT, PUMP PRESSURE MODIFICATION KIT. THIS BUILD PRICE IS FOR WEARABLE ITEMS AND UPGRADED PARTS COMMON ON MOST BUILDS HARD PART DAMAGE WILL REQUIRE ADDITIONAL COSTS THAT CAN ONLY BE DETERMINED ONCE TRANSMISSION IS DIS ASSEMBLED. LUKE HARRISON $4,895.00 
2021-02-26B. UPON DIS ASSEMBLY OF THE TRANSMISSION TECHNICIAN NOTED DAMAGE TO A COUPLE HARD PARTS. HARD PARTS AS LISTED ABOVE ARE NOT PART OF OUR TRANSMISSION RE BUILDS. THE PARTS LISTED ARE REQUIRED IN ORDER TO COMPLETE THE TRANSMISSION BUILD. LUKE HARRISON $458.21 
2021-02-26C. TRANSMISSION - ALLISON - PLEASE INSTALL FLEECE UPGRADED TRANSMISSION LINE SET. (FLEECE FPE-TL-LB7-LLY). TYLER SPANGLER $711.40 
2021-02-26D. TECHNICIAN NOTED THERE TO BE A STIFF SPOT IN THE REAR DRIVESHAFT REAR MOST UNIVERSAL JOINT AT TIME OF TRANSMISSION REPAIRS. TECHNICIAN RECOMMENDS REPLACE JOINT AT THIS TIME TO ENSURE PROPER DRIVE SHAFT FUNCTION AND BALANCE. TYLER SPANGLER $65.36 
2021-03-02E. AIR FILTER CLEAN AND RE-CHARGE SERVICE - K&N - TECHNICIAN NOTED THE ENGINE AIR FILTER WAS SUPER PLUGGED AND WENT AHEAD TO CLEAN THE FILTER TO AVOID ISSUES WHILE BREAKING IN THE TRANSMISSION. TECHNICIAN ALSO NOTED THE ENGINE AIR FILTER IS MUCH TOO SMALL FOR THE TRUCK AND SHOULD BE REPLACED WITH AN ADEQUATE FILTER.  TYLER SPANGLER $19.99 
Discount (100.00%)-19.990.00 
Sub-total $6,129.97 
Hazardous Materials Disposal$48.26 
Shop Supplies$49.11 
Sub-total $6,227.34 
Tax ($7.23%)$444.42 
Total $6,671.76 
Total Discount $19.99 
Fee

Payments
Total Payments To Date $6,671.76 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap