Invoice #28737 for DAVES CONSTRUCTION (Russel Rowe)
3-575-868-3373
2006 GMC Dually Lb Crew Cab

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2021-03-12BG - FLUSH - BRAKE DANIEL WALDRON $84.99 
2021-03-12COURTESY INSPECTION (FREE) - TECHNICIAN NOTES, THE BRAKE FLUID IS DARK AND DUE FOR SERVICE, THE POWER STEERING FLUID WAS LOW, BOTH REAR AXLE SEALS ARE WET, THE POWER STEERING LINES AND GEAR BOX ARE WET, THE SERPENTINE BELT HAS MINOR CRACKING, THE FRONT AND REAR BRAKE PADS ARE AT 5/32", THE REAR DIFFERENTIAL FLUID WAS DARK AND LOW, THE FRONT DIFFERENTIAL FLUID AND TRANSFER CASE FLUID ARE SLIGHLY DARK, AND THE LOWER OIL PAN IS SEEPING. DANIEL WALDRON $0.00 
2021-03-12DIESEL - OIL CHANGE DURAMAX AND CUMMINS PREMIUM WITH BG DOC ADDITIVE OIL CHANGE SERVICE, SYNTHETIC BLEND OIL USED AND RECOMMENDED SERVICE INTERVAL OF 7,500 MILES. BG ENGINE COVERAGE ODOMETER OF FIRST SERVICE 0-50,000 MILES UP TO $4,000. 50,001 TO 100,000 MILES UP TO $2,000. MUST MAINTAIN EVERY 7,500 MILES TO REMAIN QUALIFIED. DANIEL WALDRON $134.99 
2021-03-12FUEL FILTER - DIESEL - DURAMAX 2001-2016 REPLACMENT DANIEL WALDRON $115.27 
Sub-total $335.24 
Shop Supplies$21.79 
Sub-total $357.03 
Tax ($7.25%)$24.30 
Total $381.33 
Fee

Payments
Total Payments To Date $381.33 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap