Invoice #28886 for (Jayden Forester)
6-238-573-7145
2001 Dodge RAM 2500

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2021-04-08AIR FILTER CLEAN AND RE-CHARGE SERVICE - K&N  TYLER FARNSWORTH $19.99 
2021-04-07COURTESY INSPECTION (FREE) - TECHNICIAN NOTES, THE WINDSHIELD IS CRACKED, THE OIL WAS LOW AND THE OIL CHANGE IS DUE, THE POWER STEERING FLUID IS GETTING DARK AND THE FLUID IS SLIGHLY LOW, THE BRAKE FLUID IS TURNING GREEN AND SHOULD BE SERVICED, THE FRONT MAIN CRANKSHAFT SEAL IS DRIPPING, THE OIL PAN AREA IS WET, THE TRANSMISSION PAN AREA IS WET, THE AIR FILTER IS DIRTY AND IS A CLEANABLE FILTER, THE SERPENTINE BELT IS SATURATED WITH OIL, THE WATER PUMP HAS A DRIPPING LEAK, BOTH INNER TIE RODS HAVE EXCESSIVE MOVEMENT, THE IDLER AND PITMAN ARMS BOTH HAVE EXCESSIVE MOVEMENT, THE FRONT BRAKE PADS ARE AT 2/32", THE REAR BRAKE PADS ARE AT 4/32", AND THE REAR DIFFERENTIAL FLUID IS DARK AND DUE FOR SERVICE. DANIEL WALDRON $0.00 
2021-04-07CUSTOMER STATES, THERE IS AN ENGINE OIL LEAK. PLEASE CHECK AND ADVISE. TECHNICIAN NOTES, THERE IS SEVERAL OIL LEAKS ON THE ENGINE. THE MOST MAJOR OF THE ENGINE OIL LEAKS IS COMING FROM THE FRONT CRANKSHAFT SEAL. TECHNICIAN RECOMMENDS REPLACING THE SEAL AND RECHECKING THE SEVERITY OF THE OTHER ENGINE OIL LEAKS. TYLER FARNSWORTH $313.71 
2021-04-08TECHNICIAN NOTES, BOTH INNER TIE RODS, AS WELL AS BOTH THE IDLER AND PITMAN ARMS HAVE EXCESSIVE MOVEMENT AND SHOULD BE REPLACED. **ALIGNMENT IS REQUIRED WITH THIS REPAIR** TYLER FARNSWORTH $670.88 
2021-04-07TECHNICIAN NOTES, THE WATER PUMP IS LEAKING AND MIXING WITH THE ENGINE OIL NEAR THE FRONT CRANK SEAL AND IS BEING THROWN AROUND BY THE SERPENTINE BELT. TECHNICIAN RECOMMENDS REPLACING THE WATER PUMP AT THIS TIME. TYLER FARNSWORTH $249.61 
2021-04-07TECHNICIAN RECOMMENDS REPLACING THE SERPENTINE BELT DUE TO THE FACT IT IS SATURATED WITH OIL. TECHNICIAN RECOMMENDS REPLACING IT AT THE TIME OF THE FRONT CRANKSHAFT SEAL AND WATER PUMP REPAIRS FOR DISCOUNTED LABOR. TYLER FARNSWORTH $77.70 
Sub-total $1,331.89 
Shop Supplies$49.11 
Sub-total $1,381.00 
Tax ($7.25%)$96.56 
Total $1,477.56 
Fee

Payments
Total Payments To Date $1,477.56 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap