Invoice #29768 for (Meredith Dillon)
4-737-662-8057
2004 Dodge RAM 3500

Writer:
Promotion:
 Add New Promotion
Mileage:
PO Number:
Notes:

More Info

Fixed Price:
Add Hazmat?:
Add Supplies?:
Quote Date:
RO Date:
Invoice Date:

Images

Jobs

Start Date Description Technician Amount
2021-10-11A. used 4x4 48RE automatic transmission that fits the dodge ram 2500-3500 equipped with the 5.9 cummins diesel and 4x4. This job is an installed parts and labor job meaning we will remove your old transmission and install this low mileage used transmission. The price includes parts, labor, and fluid but does not include taxes or shop supplies. We will ensure it shifts through all the gears and will ensure it will work properly before leaving our facility but no warranty after as it is a used unit. This price is with exchange of your old transmission and verification that your old transmission unit is a good buildable core (we will diss-assemble your transmission upon removal to verify at time of removal) If your core is not buildable there will be a $1,000 core charge. Most transmissions even non working are buildable-major damage would need to have accured to become non-buildable. TYLER SPANGLER $1,895.00 
2021-10-19B. TECHNICIAN NOTED THE REAR MAIN CRANKSHAFT SEAL TO BE LEAKING AND RECOMMENDS REPLACE THE SEAL AT TIME OF TRANSMISSION REPAIRS. TYLER SPANGLER $200.89 
2021-10-11C. COURTESY INSPECTION (FREE) TECHNICIAN NOTES; THIRD BRAKE LIGHT OUT, PARK BRAKE DOES NOT HOLD, ENGINE OIL SHOWS OVERDUE BY STICKER, POWER STEERING FLUID IS LOW, STEERING GEAR BOX IS LEAKING, ENGINE OIL LEAK PRESENT FROM MULTIPLE LOCATIONS, AIR FILTER INDICATOR SHOWS AIR FILTER IS DUE, BOTH UPPER BALL JOINTS HAVE A SLIGHT POP, REAR DRIVE LINE REAR MOST UNIVERSAL JOINT HAS TIGHT SPOT, FRONT SWAY BAT LINK BUSHINGS ARE WEATHERED AND STARTING TO TEAR, FRONT BRAKE PADS ARE AT 5/32", REAR BRAKE PADS ARE AT 2/32", FUEL FILTER RECOMMENDED EVERY 15K MILES, NO FLUID PRESENT IN THE TRANSFER CASE. TYLER SPANGLER $0.00 
2021-10-19D. PLEASE FILL THE TRANSFER CASE WITH PROPER FLUID. TYLER SPANGLER $46.80 
Sub-total $2,142.69 
Hazardous Materials Disposal$58.26 
Shop Supplies$59.11 
Sub-total $2,260.06 
Tax ($7.25%)$155.34 
HARD PART CORE DAMAGE CHARGE $91.86 
Total $2,507.26 
Fee

Payments
Total Payments To Date $2,507.26 
Balance Remaining $0.00 
View all Payments for this Invoice

KPI's

You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near '' at line 1You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near 'and c.CustomerID=v.CustomerID and v.VehicleID=i.VehicleID and i.InvoiceID = ...' at line 1
KPI Target Actual Gap